How to Properly Stack Spiral Pipe
Date:2019-05-28      View(s):1404      Tag:How to Properly Stack Spiral Pipe
Correct stacking of spiral pipes helps to protect the quality of spiral pipes, prolong the service life of spiral pipes, prevent deformation and erosion, and make the spiral pipes stacked orderly. It is also conducive to the later loading and inventory of spiral pipes. The screw pipe buyer should also strictly comply with the requirements of the screw pipe pile.


1) Open stacking of spiral pipes. The necessary mattress is made of wood or stone. The stacked surface needs to be slightly inclined to facilitate drainage. Pay attention to placing the flat material to prevent bending.
2) Spiral tube principle requires stacking under strong palletizing to ensure safety, according to variety, palletizing specifications, different kinds of materials are stacked separately to prevent mud and mutual erosion, and easy to install library cars.
3) It is forbidden to store steel corrosion articles around spiral steel pipe piles.
4) The bottom of spiral steel pipe pile should be cushioned, firm and smooth to prevent water or material deformation.
5) Store the same material by stacking successively.
6) The stacking height of Sspiral steel shall not exceed 1.2m for manual operation, 1.5m for mechanical operation and 2.5m for stacking.
7) Leave between the stacking and stacking of some passages. The inspection road is usually O. 5m. According to the size and material of the passage of transport machinery, it is generally 1.5-2.0m.
8) Open-pit inclination and passage should bend down and lower the mouth, the beam should stand, can not tilt steel bar upward, in order to avoid rusty water.
9) At the end of the booster stack, if the warehouse has a sunny cement floor, O.1m should be raised and O.2-0.5m should be added to the mud. If the space is open, the concrete floor booster is 0.3-0.5 m and the surface mud booster is 0.5-0.7 M.